Lakeside Phase 2-4 Stormwater Conveyance

NOTICE of the 90% complete Construction Plans available for viewing. Walnut Township Lakeside Phase 2-4 Stormwater Conveyance Project – 90% design complete.

NOTE: This project, Phase 2-4 and Phase 1, is still estimated for construction to be completed in 2026.  


The Lakeside Stormwater Conveyance Project will address flooding concerns within the Lakeside neighborhood in Walnut Township, Ohio. While adequate storm drainage is currently lacking throughout the project area, flooding in the area is exacerbated during extreme events from the backwater of South Fork Licking River (SFLR) and its tributaries. The proposed improvements will mitigate flooding in the area through the installation of storm sewers.

This memo accompanies the Stage 3 plan set deliverable for Phases 2-4 of the project and aims to provide Walnut Township with an overview of the storm sewer design and the supporting hydraulic calculations. Design includes storm sewer installation and any minor grading revisions necessary to facilitate drainage to the proposed structures. Phase 1 Design was completed by EMH&T and submitted independently to Walnut Township. The information outlined in this document… [Please view or download the two (2) attached PDF documents below for full document!]